90° Elbow, 8", Socket Connection, CPVC Construction, Schedule 40 - 406-080A
Where are we? 4 Continents 8 Countries

Got any Questions?
Speak with a real person who will go out of their way to help you!
Call Us: 1-516-482-6313Text Us: 1-516-703-3460
Quick Support
Product Information
Specification
| Category | Fittings |
| Connection Type | Socket |
| Material | CPVC |
| Manufacturer | Spears |
| Schedule | Schedule 40 |
| Size | 8" |
| Type of product | 90° Elbow |
| Part Number | 406-080A |
Description:
he fittings are copper tube sized and are ideally suited for water applications due to their corrosion resistance rating. Both pipe and fittings are manufactured to exacting standards in order to give a tight reliable fit.
Specifications:
• Direct replacement for copper tubing
• Provides dependable hot and cold water piping systems
• Provides a lifetime of reliable service
• Pipe and fitting are manufactured to exacting standards for a tight, reliable fit
• Ideally suited for water applications due to their corrosion resistance rating
• Ideal for replacing copper tubing
Reviews
Call Us: 1-516-482-6313 Text Us: 1-516-703-3460
Garrie AI: Your Cable Guide