Reducing Coupling, 8" x 6", Socket Construction, CPVC Construction, Sc
nassaunationalcable.com/en-ca/products/reducing-coupling-8-x-6-socket-construction-cpvc-construction-schedule-40-829c-585s
Items in Cart ()
View cart

Reducing Coupling, 8" x 6", Socket Construction, CPVC Construction, Schedule 40 - 829C-585S

Reducing Coupling, 8" x 6", Socket Construction, CPVC Construction, Schedule 40 - 829C-585S
Roll over image to Zoom
Reducing Coupling, 8" x 6", Socket Construction, CPVC Construction, Schedule 40 - 829C-585S
SKU: 829C-585S
Price:
Shipping Cost Calculated at Checkout. Standard Lead Time is 1 to 6 Business Days.
Quantity must be 1 or more

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)

Where are we? 4 Continents 8 Countries

map
garrie

Got any Questions?

Speak with a real person who will go out of their way to help you!

Call Us: 1-516-482-6313Text Us: 1-516-703-3460

Product Information

Specification

Category Fittings
Connection Type Socket
Material CPVC
Manufacturer Spears
Schedule Schedule 40
Size 8" x 6"
Type of product Reducing Coupling
Part Number 829C-585S


Description:

The fittings are copper tube sized and are ideally suited for water applications due to their corrosion resistance rating. Both pipe and fittings are manufactured to exacting standards in order to give a tight reliable fit.

 

Specification:

• Direct replacement for copper tubing
• Provides dependable hot and cold water piping systems
• Provides a lifetime of reliable service
• Pipe and fitting are manufactured to exacting standards for a tight, reliable fit
• Ideally suited for water applications due to their corrosion resistance rating
• Ideal for replacing copper tubing

Reviews

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
Get in Touch
Live Chat Get replies right away!
Email info@nassaunationalcable.com

Call Us: 1-516-482-6313    Text Us: 1-516-703-3460