Long Leads With Dual Battery Harness D122L
nassaunationalcable.com/en-ca/products/long-leads-with-dual-battery-harness-d122l
Items in Cart ()
View cart

Long Leads With Dual Battery Harness D122L

Long Leads With Dual Battery Harness D122L
Roll over image to Zoom
Long Leads With Dual Battery Harness D122L
SKU: D122L

Select a Variant

Long Leads With Dual Battery Harness D122L

Availability: In stock

Price:
Regular price
$19.60
Sale price
$19.60
Shipping Cost Calculated at Checkout. Standard Lead Time is 1 to 6 Business Days.
Quantity must be 1 or more

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)

Where are we? 4 Continents 8 Countries

map
garrie

Got any Questions?

Speak with a real person who will go out of their way to help you!

Call Us: 1-516-482-6313Text Us: 1-516-703-3460

Product Information

Specification

 Type Battery Harness
Usage Enclosure
Part No D122L


Long Leads With Dual Battery Harness 

Description


"Long Leads with Dual Battery Harness" refers to a product that includes extended wiring leads, specifically designed for a dual battery system. The term "Long Leads" indicates that the included wiring is longer than standard, offering flexibility in placing and connecting the two batteries within the system. This product is intended to simplify the connection and management of two batteries in a dual battery setup, ensuring a more efficient and organized system.

Features        

• Slide-on connectors.
• Built-in circuit breaker protection.
• Used for batteries in parallel in a separate enclosure.

Download PDF Spec Sheet

Reviews

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
Get in Touch
Live Chat Get replies right away!
Email info@nassaunationalcable.com

Call Us: 1-516-482-6313    Text Us: 1-516-703-3460