8" Socket Connection PVC Construction Schedule 80 806-080S
nassaunationalcable.com/en-ca/products/8-socket-connection-pvc-construction-schedule-80-806-080s
Items in Cart ()
View cart

8" Socket Connection PVC Construction Schedule 80 806-080S

8" Socket Connection PVC Construction Schedule 80 806-080S
Roll over image to Zoom
8" Socket Connection PVC Construction Schedule 80 806-080S
SKU: 806-080S
Price:
Shipping Cost Calculated at Checkout. Standard Lead Time is 1 to 6 Business Days.
Quantity must be 1 or more

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)

Where are we? 4 Continents 9 Countries

map
garrie

Got any Questions?

Speak with a real person who will go out of their way to help you!

Call Us: 1-516-482-6313Text Us: 1-516-703-3460

Product Information

Specification

Product Number : 806-080S
Category : Fittings
Connection Type : Socket
Material : PVC
Manufacturer : Spears
Schedule : Schedule 80
Size : 8"
Type of product : 90° Elbow


8" Socket Connection PVC Construction Schedule 80 806-080S

Description:
•
PVC is the most commonly used plastic material for manufacturing plastic pipe. It has a relatively high tensile strength and module of elasticity. These features make it stronger and more rigid than most other thermoplastics. It is also resistant to most acids, bases, salts, aliphatic solutions, oxidants, and halogens. The joining methods for PVC are solvent cementing, threading (Schedule 80 ONLY), or flanging. PVC has been used successfully in industries such as chemical processing, industrial plating, chilled water distribution, salt water, chemical drainage, irrigation systems, and other industrial applications with the corrosive fluid transfer. The pressure rating systems given are for solvent-cemented systems. When adding valves, flanges, or other components, the system must be de-rated to the rating of the lowest component: threaded fittings are rated at 50% of solvent-cement systems; flanged fittings are rated at 150 psi; union fittings are rated at 235 psi. Please see manufacturers' recommendations for other ratings. Do not test or use PVC piping for air or compressed gases.

Features:
• Economical to install and maintain
• IPS-sized (inches) 1/8-24"
• Can be threaded
• Normally gray in color
• Not affected by soil in buried applications; required water-based latex paint for outdoor, sunlight-exposed installations
• Handles temperatures up to 140
• Conforms to ASTM D-1785, Type 1, Grade 1
• All PVC piping is produced from the NSF approved compounds conforming to ASTM D-1784
• National Sanitation Foundation (NSF) approved pipe sizes of 1/2-12" for use in potable water service
• Available in larger sizes on request

Reviews

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
Get in Touch
Live Chat Get replies right away!
Email info@nassaunationalcable.com

Call Us: 1-516-482-6313    Text Us: 1-516-703-3460