{"product_id":"long-leads-with-dual-battery-harness-d122l","title":"Long Leads With Dual Battery Harness D122L","description":"\u003cp\u003e[pdf]\u003cembed src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/0213\/7895\/7412\/files\/bosch_561bfef6-7498-45ba-b653-1ea834e52a6f.pdf?v=1705385457\" width=\"\" height=\"\" type=\"application\/pdf\"\u003e [\/pdf]\u003cstrong\u003e\u003c\/strong\u003e\u003c\/p\u003e\n\u003ctable style=\"width: 48.3929%; height: 58.7814px;\" width=\"100%\"\u003e\n\u003ctbody\u003e\n\u003ctr style=\"height: 19.5938px;\"\u003e\n\u003ctd style=\"text-align: center; width: 49.5726%; height: 19.5938px;\"\u003e\u003cstrong\u003e Type\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"text-align: center; width: 49.5726%; height: 19.5938px;\"\u003eBattery Harness\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"height: 19.5938px;\"\u003e\n\u003ctd style=\"text-align: center; width: 49.5726%; height: 19.5938px;\"\u003e\u003cstrong\u003eUsage\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"text-align: center; width: 49.5726%; height: 19.5938px;\"\u003eEnclosure\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr style=\"height: 19.5938px;\"\u003e\n\u003ctd style=\"text-align: center; width: 49.5726%; height: 19.5938px;\"\u003e\u003cstrong\u003ePart No\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"text-align: center; width: 49.5726%; height: 19.5938px;\"\u003eD122L\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003cp\u003e\u003cstrong\u003e\u003cbr\u003eLong Leads With Dual Battery Harness \u003cbr\u003e\u003cbr\u003eDescription\u003c\/strong\u003e\u003cbr\u003e\u003cbr\u003e\"Long Leads with Dual Battery Harness\" refers to a product that includes extended wiring leads, specifically designed for a dual battery system. The term \"Long Leads\" indicates that the included wiring is longer than standard, offering flexibility in placing and connecting the two batteries within the system. This product is intended to simplify the connection and management of two batteries in a dual battery setup, ensuring a more efficient and organized system.\u003cbr\u003e\u003cbr\u003e\u003cstrong\u003eFeatures        \u003c\/strong\u003e\u003cbr\u003e\u003cbr\u003e• Slide-on connectors.\u003cbr\u003e• Built-in circuit breaker protection.\u003cbr\u003e• Used for batteries in parallel in a separate enclosure.\u003cbr\u003e\u003c\/p\u003e","brand":"Bosch","offers":[{"title":"Default Title","offer_id":44335959572634,"sku":"D122L","price":19.6,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0213\/7895\/7412\/files\/121_16ea14f9-e31a-4f38-867d-759a2b63f015.png?v=1762989344","url":"https:\/\/nassaunationalcable.com\/en-ca\/products\/long-leads-with-dual-battery-harness-d122l","provider":"NassauNationalCable","version":"1.0","type":"link"}