{"product_id":"female-adapter-6-socket-x-fpt-connection-pvc-construction-schedule-80-835-060s","title":"Female Adapter 6\" Socket x FPT Connection, PVC Construction  Schedule 80 835-060S","description":"\u003ctable class=\"specTable table table-striped col-lg-8 col-md-12\" style=\"width: 350.122px;\" data-mce-fragment=\"1\"\u003e\n\u003ctbody data-mce-fragment=\"1\"\u003e\n\u003ctr class=\"\" data-mce-fragment=\"1\"\u003e\n\u003ctd class=\"code\" style=\"width: 174px;\" data-mce-fragment=\"1\"\u003e\u003cstrong\u003eCategory\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd class=\"value\" style=\"width: 162.122px;\" data-mce-fragment=\"1\"\u003eFittings\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr class=\"\" data-mce-fragment=\"1\"\u003e\n\u003ctd class=\"code\" style=\"width: 174px;\" data-mce-fragment=\"1\"\u003e\u003cstrong\u003eConnection Type\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd class=\"value\" style=\"width: 162.122px;\" data-mce-fragment=\"1\"\u003eSocket x FPT\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr class=\"\" data-mce-fragment=\"1\"\u003e\n\u003ctd class=\"code\" style=\"width: 174px;\" data-mce-fragment=\"1\"\u003e\u003cstrong\u003eMaterial\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd class=\"value\" style=\"width: 162.122px;\" data-mce-fragment=\"1\"\u003ePVC\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr class=\"\" data-mce-fragment=\"1\"\u003e\n\u003ctd class=\"code\" style=\"width: 174px;\" data-mce-fragment=\"1\"\u003e\u003cstrong\u003eManufacturer\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd class=\"value\" style=\"width: 162.122px;\" data-mce-fragment=\"1\"\u003eSpears\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr class=\"\" data-mce-fragment=\"1\"\u003e\n\u003ctd class=\"code\" style=\"width: 174px;\" data-mce-fragment=\"1\"\u003e\u003cstrong\u003eSchedule\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd class=\"value\" style=\"width: 162.122px;\" data-mce-fragment=\"1\"\u003eSchedule 80\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr class=\"\" data-mce-fragment=\"1\"\u003e\n\u003ctd class=\"code\" style=\"width: 174px;\" data-mce-fragment=\"1\"\u003e\u003cstrong\u003eSize\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd class=\"value\" style=\"width: 162.122px;\" data-mce-fragment=\"1\"\u003e6\"\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr class=\"\" data-mce-fragment=\"1\"\u003e\n\u003ctd class=\"code\" style=\"width: 174px;\" data-mce-fragment=\"1\"\u003e\u003cstrong\u003eType of product\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd class=\"value\" style=\"width: 162.122px;\" data-mce-fragment=\"1\"\u003eFemale Adapter\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr class=\"\" data-mce-fragment=\"1\"\u003e\n\u003ctd class=\"code\" style=\"width: 174px;\" data-mce-fragment=\"1\"\u003e\u003cstrong\u003ePart Number\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd class=\"value\" style=\"width: 162.122px;\" data-mce-fragment=\"1\"\u003e835-060S\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003ch3\u003e\u003cstrong\u003eDescription:\u003c\/strong\u003e\u003c\/h3\u003e\n\u003cp\u003ePVC is the most commonly used plastic material for manufacturing plastic pipes. It has a relatively high tensile strength and module of elasticity. These features make it stronger and more rigid than most other thermoplastics. It is also resistant to most acids, bases, salts, aliphatic solutions, oxidants, and halogens. The joining methods for PVC are solvent cementing, threading (Schedule 80 ONLY), or flanging. PVC has been used successfully in industries such as chemical processing, industrial plating, chilled water distribution, salt water, chemical drainage, irrigation systems, and other industrial applications with corrosive fluid transfer. The pressure rating systems given are for solvent-cemented systems. When adding valves, flanges, or other components, the system must be de-rated to the rating of the lowest component: threaded fittings are rated at 50% of solvent-cement systems; flanged fittings are rated at 150 psi; union fittings are rated at 235 psi. Please see manufacturers' recommendations for other ratings. Do not test or use PVC piping for air or compressed gases.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eProduct Features:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan data-mce-fragment=\"1\"\u003e• \u003c\/span\u003eEconomical to install and maintain\u003cbr\u003e\u003cspan data-mce-fragment=\"1\"\u003e• \u003c\/span\u003eIPS-sized (inches) 1\/8-24\"\u003cbr\u003e\u003cspan data-mce-fragment=\"1\"\u003e• \u003c\/span\u003eCan be threaded\u003cbr\u003e\u003cspan data-mce-fragment=\"1\"\u003e• \u003c\/span\u003eNormally gray in color\u003cbr\u003e\u003cspan data-mce-fragment=\"1\"\u003e• \u003c\/span\u003eNot affected by soil in buried applications; required water-based latex paint for outdoor, sunlight-exposed installations\u003cbr\u003e\u003cspan data-mce-fragment=\"1\"\u003e•  \u003c\/span\u003eHandles temperatures up to 140\u003cbr\u003e\u003cspan data-mce-fragment=\"1\"\u003e• \u003c\/span\u003eConforms to ASTM D-1785, Type 1, Grade 1\u003cbr\u003e\u003cspan data-mce-fragment=\"1\"\u003e• \u003c\/span\u003eAll PVC piping is produced from the NSF approved compounds conforming to ASTM D-1784\u003cbr\u003e\u003cspan data-mce-fragment=\"1\"\u003e• \u003c\/span\u003eNational Sanitation Foundation (NSF) approved pipe sizes of 1\/2-12\" for use in potable water service\u003cbr\u003e\u003cspan data-mce-fragment=\"1\"\u003e• \u003c\/span\u003eAvailable in larger sizes on request\u003c\/p\u003e","brand":"Harrington","offers":[{"title":"Default Title","offer_id":43237214126234,"sku":"835-060S","price":0.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0213\/7895\/7412\/products\/835-002.png?v=1759820921","url":"https:\/\/nassaunationalcable.com\/en-ca\/products\/female-adapter-6-socket-x-fpt-connection-pvc-construction-schedule-80-835-060s","provider":"NassauNationalCable","version":"1.0","type":"link"}