{"product_id":"90-elbow-8-socket-connection-cpvc-construction-schedule-40-406-080a","title":"90° Elbow, 8\", Socket Connection, CPVC Construction, Schedule 40 - 406-080A","description":"\u003ctable class=\"specTable table table-striped col-lg-8 col-md-12\" style=\"width: 445px;\" data-mce-fragment=\"1\"\u003e\n\u003ctbody data-mce-fragment=\"1\"\u003e\n\u003ctr class=\"\" data-mce-fragment=\"1\"\u003e\n\u003ctd class=\"code\" style=\"width: 160.64px;\" data-mce-fragment=\"1\"\u003e\u003cstrong\u003eCategory\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd class=\"value\" style=\"width: 267.36px;\" data-mce-fragment=\"1\"\u003eFittings\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr class=\"\" data-mce-fragment=\"1\"\u003e\n\u003ctd class=\"code\" style=\"width: 160.64px;\" data-mce-fragment=\"1\"\u003e\u003cstrong\u003eConnection Type\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd class=\"value\" style=\"width: 267.36px;\" data-mce-fragment=\"1\"\u003eSocket\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr class=\"\" data-mce-fragment=\"1\"\u003e\n\u003ctd class=\"code\" style=\"width: 160.64px;\" data-mce-fragment=\"1\"\u003e\u003cstrong\u003eMaterial\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd class=\"value\" style=\"width: 267.36px;\" data-mce-fragment=\"1\"\u003eCPVC\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr class=\"\" data-mce-fragment=\"1\"\u003e\n\u003ctd class=\"code\" style=\"width: 160.64px;\" data-mce-fragment=\"1\"\u003e\u003cstrong\u003eManufacturer\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd class=\"value\" style=\"width: 267.36px;\" data-mce-fragment=\"1\"\u003eSpears\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr class=\"\" data-mce-fragment=\"1\"\u003e\n\u003ctd class=\"code\" style=\"width: 160.64px;\" data-mce-fragment=\"1\"\u003e\u003cstrong\u003eSchedule\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd class=\"value\" style=\"width: 267.36px;\" data-mce-fragment=\"1\"\u003eSchedule 40\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr class=\"\" data-mce-fragment=\"1\"\u003e\n\u003ctd class=\"code\" style=\"width: 160.64px;\" data-mce-fragment=\"1\"\u003e\u003cstrong\u003eSize\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd class=\"value\" style=\"width: 267.36px;\" data-mce-fragment=\"1\"\u003e8\"\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr class=\"\" data-mce-fragment=\"1\"\u003e\n\u003ctd class=\"code\" style=\"width: 160.64px;\" data-mce-fragment=\"1\"\u003e\u003cstrong\u003eType of product\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd class=\"value\" style=\"width: 267.36px;\" data-mce-fragment=\"1\"\u003e90° Elbow\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr class=\"\" data-mce-fragment=\"1\"\u003e\n\u003ctd class=\"code\" style=\"width: 160.64px;\" data-mce-fragment=\"1\"\u003e\u003cstrong\u003ePart Number\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd class=\"value\" style=\"width: 267.36px;\" data-mce-fragment=\"1\"\u003e406-080A\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003cbr\u003e\n\u003ch3\u003eDescription:\u003c\/h3\u003e\n\u003cp\u003e\u003cspan\u003ehe fittings are copper tube sized and are ideally suited for water applications due to their corrosion resistance rating. Both pipe and fittings are manufactured to exacting standards in order to give a tight reliable fit.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch3\u003e\u003cspan\u003eSpecifications:\u003c\/span\u003e\u003c\/h3\u003e\n\u003cp\u003e\u003cspan\u003e• Direct replacement for copper tubing\u003cbr\u003e• Provides dependable hot and cold water piping systems\u003cbr\u003e• Provides a lifetime of reliable service\u003cbr\u003e• Pipe and fitting are manufactured to exacting standards for a tight, reliable fit\u003cbr\u003e• Ideally suited for water applications due to their corrosion resistance rating\u003cbr\u003e• Ideal for replacing copper tubing\u003c\/span\u003e\u003c\/p\u003e\n\u003cquillbot-extension-portal\u003e\u003c\/quillbot-extension-portal\u003e","brand":"Harrington","offers":[{"title":"Default Title","offer_id":43419962605722,"sku":"406-080A","price":0.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0213\/7895\/7412\/products\/406-080A.png?v=1762960484","url":"https:\/\/nassaunationalcable.com\/en-ca\/products\/90-elbow-8-socket-connection-cpvc-construction-schedule-40-406-080a","provider":"NassauNationalCable","version":"1.0","type":"link"}