{"product_id":"6-socket-connection-pvc-construction-schedule-80-806-060s","title":"6\" Socket Connection PVC Construction Schedule 80 806-060S","description":"\u003ctable width=\"100%\"\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd style=\"width: 22.8923%;\" data-mce-style=\"width: 22.8923%;\"\u003e\u003cstrong\u003eProduct Number :\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"width: 74.3704%;\" data-mce-style=\"width: 74.3704%;\"\u003e806-060S\u003cbr\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"width: 22.8923%;\" data-mce-style=\"width: 22.8923%;\"\u003e\u003cstrong\u003eCategory :\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"width: 74.3704%;\" data-mce-style=\"width: 74.3704%;\"\u003eFittings\u003cbr\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"width: 22.8923%;\" data-mce-style=\"width: 22.8923%;\"\u003e\u003cstrong\u003eConnection Type :\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"width: 74.3704%;\" data-mce-style=\"width: 74.3704%;\"\u003eSocket\u003cbr\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"width: 22.8923%;\" data-mce-style=\"width: 22.8923%;\"\u003e\u003cstrong\u003eMaterial :\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"width: 74.3704%;\" data-mce-style=\"width: 74.3704%;\"\u003ePVC\u003cbr\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"width: 22.8923%;\" data-mce-style=\"width: 22.8923%;\"\u003e\u003cstrong\u003eManufacturer :\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"width: 74.3704%;\" data-mce-style=\"width: 74.3704%;\"\u003eSpears\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"width: 22.8923%;\" data-mce-style=\"width: 22.8923%;\"\u003e\u003cstrong\u003eSchedule :\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"width: 74.3704%;\" data-mce-style=\"width: 74.3704%;\"\u003eSchedule 80\u003cbr\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"width: 22.8923%;\" data-mce-style=\"width: 22.8923%;\"\u003e\u003cstrong\u003eSize :\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"width: 74.3704%;\" data-mce-style=\"width: 74.3704%;\"\u003e6\"\u003cbr\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"width: 22.8923%;\" data-mce-style=\"width: 22.8923%;\"\u003e\u003cstrong\u003eType of product :\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"width: 74.3704%;\" data-mce-style=\"width: 74.3704%;\"\u003e90° Elbow\u003cbr\u003e\n\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003cp\u003e\u003cstrong\u003e\u003cbr\u003e6\" Socket Connection PVC Construction Schedule 80 806-060S\u003cbr\u003e\u003cbr\u003e\u003c\/strong\u003e\u003cstrong\u003eDescription:\u003cbr\u003e• \u003c\/strong\u003ePVC is the most commonly used plastic material for manufacturing plastic pipe. It has a relatively high tensile strength and module of elasticity. These features make it stronger and more rigid than most other thermoplastics. It is also resistant to most acids, bases, salts, aliphatic solutions, oxidants, and halogens. The joining methods for PVC are solvent cementing, threading (Schedule 80 ONLY), or flanging. PVC has been used successfully in industries such as chemical processing, industrial plating, chilled water distribution, salt water, chemical drainage, irrigation systems, and other industrial applications with the corrosive fluid transfer. The pressure rating systems given are for solvent-cemented systems. When adding valves, flanges, or other components, the system must be de-rated to the rating of the lowest component: threaded fittings are rated at 50% of solvent-cement systems; flanged fittings are rated at 150 psi; union fittings are rated at 235 psi. Please see manufacturers' recommendations for other ratings. Do not test or use PVC piping for air or compressed gases.\u003cbr data-mce-fragment=\"1\"\u003e\u003cstrong\u003e\u003cbr\u003eFeatures:\u003cbr\u003e\u003c\/strong\u003e• Economical to install and maintain\u003cbr data-mce-fragment=\"1\"\u003e• IPS-sized (inches) 1\/8-24\"\u003cbr data-mce-fragment=\"1\"\u003e• Can be threaded\u003cbr data-mce-fragment=\"1\"\u003e• Normally gray in color\u003cbr data-mce-fragment=\"1\"\u003e• Not affected by soil in buried applications; required water-based latex paint for outdoor, sunlight-exposed installations\u003cbr data-mce-fragment=\"1\"\u003e• Handles temperatures up to 140\u003cbr data-mce-fragment=\"1\"\u003e• Conforms to ASTM D-1785, Type 1, Grade 1\u003cbr data-mce-fragment=\"1\"\u003e• All PVC piping is produced from the NSF approved compounds conforming to ASTM D-1784\u003cbr data-mce-fragment=\"1\"\u003e• National Sanitation Foundation (NSF) approved pipe sizes of 1\/2-12\" for use in potable water service\u003cbr data-mce-fragment=\"1\"\u003e• Available in larger sizes on request\u003cstrong\u003e\u003cbr\u003e\u003c\/strong\u003e\u003c\/p\u003e\n\u003cdiv class=\"featureBenefitElement\"\u003e\u003c\/div\u003e","brand":"Harrington","offers":[{"title":"Default Title","offer_id":43223742972058,"sku":"806-060S","price":0.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0213\/7895\/7412\/products\/2_273d1c92-808e-42d2-809e-0a28e88f71b4.png?v=1759820885","url":"https:\/\/nassaunationalcable.com\/en-ca\/products\/6-socket-connection-pvc-construction-schedule-80-806-060s","provider":"NassauNationalCable","version":"1.0","type":"link"}